Hamilton Avenue, Surfers Paradise
Hamilton Avenue presents an exclusive collection of ultra-luxury full-floor and two-per-floor residences, masterfully designed by award-winning architects DKO Architecture and developed by GCAP Property. This is a rare address where architectural distinction, refined materials, and bespoke wellness and lifestyle amenities converge — including a horizon-edge pool, private spa sanctuary, and lush subtropical landscaping — setting a new benchmark in coastal sophistication.
Each residence is meticulously crafted with expansive floorplates, soaring ocean, skyline, and hinterland vistas, and interiors defined by stone-wrapped kitchen islands, bronze fixtures, sculpted joinery, and fine timber finishes. Every detail has been considered to create a home where elegance, light, and functionality exist in perfect harmony.
Seamless indoor-outdoor living areas, private lift lobbies, and master suites with spa-inspired ensuites provide elevated retreats above the city. Generous glazing and thoughtful layouts frame uninterrupted views and capture the coastal light, creating a sense of calm rarely found this close to Surfers Paradise Beach.
Ideally positioned in one of the Gold Coast’s most coveted precincts in Northcliffe, Hamilton Avenue delivers privacy, scale, and sophistication — a signature coastal residence for the discerning buyer seeking refined, elevated living.
Developer: GCAP Property | Architect: DKO Architecture
Project features:
- Just meters from the Sand
- Panoramic, never-to-be-built-out ocean views from every residence
- Full-floor layouts with 293m² and 25m of ocean frontage
- Interiors blend Manhattan influence with modern Art Deco style
- Resort-inspired amenities focused on wellness and privacy
- Private full-floor living, direct lift access and no shared walls to full-floor residences
- Gaggenau European appliances including Gaggenau wine fridge
- Ocean-facing resort-style pool
- Wellness Centre with gym, sauna, steam room, ice bath and spa, with private dining and lounge facilities
- Construction to commence Q3 2026




